Allocating a control resource
This procedure describes how to allocate a control resource for a job.
To allocate a control resource:
- In the Workspace, select the job.
- Click
. - From the Prerequisites tab, in the Control Resources section, click
.A new row is added to the Control Resources list.
- In Control Resources, do the following:
- In the Resource Name field, type a name of the control resource.
- From the Type drop-down list, select either Shared or Exclusive.
- (z/OS) From the On Fail drop-down list, select either Release or keep.
The control resource is allocated. For more information, see Control Resources.